Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13641670

- Product Categories
- Straw recycling machine
- Straw balers
- Stover coating machine
- Straw bale recycling machine
- Feed chaff
- Feed mill
- Feed particle machine
- Straw rubbing wire machine
- Feed mixer
- Cited by machine
- Caolian
- Friendly Links
Information Name: | The best-selling cheap large feed mixer |
Published: | 2015-03-24 |
Validity: | 30 |
Specifications: | 230 |
Quantity: | 1000.00 |
Price Description: | |
Detailed Product Description: | Installation and use Edit 1. Fixed units: Units should ensure that the unit is installed horizontally base (such as uneven wooden pad level available), or likely to cause the unit to vibrate. 2. Check the connecting parts, bolts are loose, hand propeller shaft, check whether the card touch the phenomenon and to promote flexible rotor hammer crusher is flexible, and reliable. 3. Power, switch, wire insulation must reliable, easy to control, do not use a fuse or fuses with rated current of the motor units supporting non-compliance. Above 4.5KW motor overload protection device must be matched. 5. Empty machine (without accord) Check the motor rotation direction arrow signs shall specify the motor direction of rotation, otherwise it may damage the machine, if turned right, can swap any two motor connector location. 6. Check the drive belt tensioner each case (motor can move around, AB impeller can move back and forth), so appropriate. 7. Check the conveying pipe, the connecting parts of the mixer seamless pink phenomenon, from the observation hole to see inside the main hopper and propulsion whether the debris, without the normal. 8. formulated feed a cabin for a batch. Weigh out the required mixed feed materials. First start mixing motor, start grinding motor (otherwise stuck impeller, burn out the motor), fed from the hopper without crushing materials deputy, fried rice cake mill to be pulverized material was added on both sides at the same time, until all primary and secondary material processing Continue stirring for 5-10 minutes to complete a cycle is completed and then, after bagging the finished product, and then the next batch of production. Note: Adding a small amount of material must be progressively expanded 9. To promptly remove the material in the debris, metal, sand, so as not to damage parts |
Admin>>>
You are the 31543 visitor
Copyright © GuangDong ICP No. 10089450, Qufu Wan Teng Machinery Co., Ltd. · All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 31543 visitor
Copyright © GuangDong ICP No. 10089450, Qufu Wan Teng Machinery Co., Ltd. · All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility